Opaque building envelop
The construction system is built on a concrete floor slab supported completely with EPS insulation.
The timber frame walls are constructed with studs at 60cm centres with OSB fixed on the inside and wood fibre board and breather membrane fixed tot he outside. The service cavity is formed with 47x47mm battens with mineral insulation between and gypsum board on the room side. The rainscreen cladding is fixed on battens which are fixed through to the timber studs.
The upper floors are formed with metal web joists with OSB deck and gypsum screed. The roof construction is formed with rafters at 60cm spacings with cellulose insulation between, breather membrane above with battens and roof tiles. An air-tightness membrane is fitted below with cross battens and gypsum board over.
Windows
The certification was done with the window smartwin solar i, which is a very slim phA-class window with triple 18 mm argon glazing, Swisspacer Ultimate spacer bar with PU secondary seal. A special feature of smatwin solar i is, that the reveal becomes part of the windows frame.
Airtightness concept
The airtightness layer in the walls is OSB board. The OSB boards are sealed together and to the windows with an air-tightness tape. The OSB boardm ust be of sufficient airtightness. An airtightness membrane is fitted to the ceiling with airtightness tape at all junctions and connections.
Spannendes Seminar zur seriellen Sanierung kleiner Gebäude
Kann ein detailliertes, serielles Renovierungssystem für Hülle und Haustechnik die Sanierungsquote nachhaltig erhöhen?
21st Open Days from June 28th to 30th : Passive House Day Participation 2024
Open Days at Passivhaus Freundorfer in Oberaudorf / Oberbayern
27th International Passive House Conference on 5 and 6 April 2024 - "Retrofit. Have an impact"
We are once again participating. Visit us at Booth No. 23. We will showcase the advancements in our new sliding door, smartwin sliding solar, and our…